Summary of SpecLink Contents - Masterformat 2004

Division 01 - General Requirements

Sections in this Division = 45

Catalog Key: A=Architectural, S=Structural Engineering, C=Civil Engineering, L=Landscape Architecture, ME=Mechanical/Electrical, # or DC=Design Criteria

Status Number Title Synopsis Author Catalogs Updated
Current 01 1000 Summary Contract description(s); basic project conditions; work not shown on drawings. BSD ASCLME* Feb 09
Current 01 2000 Price and Payment Procedures Applications for payment, Schedule of Values, modifications, closeout procedures. BSD ASCLME* Feb 09
Current 01 2100 Allowances Allowances procedures; description of allowances. BSD ASCLME Jan 09
REV 01 2200 Unit Prices Unit prices procedures; description of items to be priced or prices to be included. BSD ASCLME Nov 11
Current 01 2300 Alternates Alternatives (alternates) procedures; description of alternatives. BSD ASCLME Aug 11
Current 01 3000 Administrative Requirements Submittals, meetings, schedules, reports, coordination, photographs, etc. BSD ASCLME* Jun 11
Current 01 3050 Design Procedures and Substantiation Requirements For design-build projects; design documentation and substantiation. BSD ASCLME* Aug 11
Current 01 3114 Facility Services Coordination Major project coordinator; coordination drawings. BSD ASCLME Jan 09
Current 01 3216 Construction Progress Schedule Detailed schedule requirements (augments Section 01300). BSD ASCLME May 10
Current 01 3514 LEED Credit Summary ++ Pre-2009; for documenting credit intentions; linked to Section 013515 (01355). BSD ASCLME Jul 11
REV 01 3514.01 LEED-NC 2009 Credit Summary ++ For documenting credit intentions; linked to Section 013515 (01355). BSD ASCLME Nov 11
REV 01 3514.02 LEED for Schools 2009 Credit Summary ++ For documenting credit intentions; linked to Section 013515 (01355). BSD ASCLME Nov 11
Current 01 3514.03 LEED-CS 2009 Credit Summary ++ For documenting credit intentions; linked to Section 013515 (01355). BSD ASCLME Jul 11
Current 01 3514.04 LEED-CI 2009 Credit Summary ++ For documenting credit intentions; linked to Section 013515 (01355). BSD ASCLME Jul 11
Current 01 3515 LEED Certification Procedures Contractor procedures supporting certification; linked to/from the Credit Summaries. BSD ASCLME Aug 11
Current 01 3516 LEED Submittal Forms Procedural requirements relating to LEED construction contract administration forms. BSD ASCLME Jan 09
Current 01 3516.01 LEED Material Cost Summary Form For contractor to document total costs to be used in LEED calculations. BSD ASCLME Feb 11
Current 01 3516.02 LEED Wood-Containing Product List For contractor to provide info needed for computing certified wood credit. BSD ASCLME Feb 11
Current 01 3516.03 LEED Metal-Containing Product List For collecting information necessary for recycled content credits. BSD ASCLME Feb 11
Current 01 3516.04 LEED New Product Content Form For collecting info on recycled, rapidly renewable, and certified wood content. BSD ASCLME Aug 11
Current 01 3516.05 LEED New Product Source Form For collecting info on regionally produced material credits. BSD ASCLME Feb 11
Current 01 3516.06 LEED Reused Product Form For collecting info for reused materials credits. BSD ASCLME Feb 11
Current 01 3516.07 LEED Prohibited Content Installer Certification For documenting that only low-emission products have been used. BSD ASCLME Feb 11
REV 01 3553 Security Procedures Contractor procedures; augments Section 01 5000 (01500) with more detail. BSD ASCLME Sep 11
Current 01 4000 Quality Requirements Testing, inspection, mock-ups, reports, certificates; use of reference standards. BSD ASCLME* Aug 11
Current 01 4100 Regulatory Requirements List of regulations applicable to project; for information or as design criteria. BSD ASCLME* Aug 09
Current 01 4216 Definitions Definitions not specific to other sections and not in the General Conditions. BSD ASCLME* Apr 11
REV 01 4219 Reference Standards Full title and edition date; use of reference standards (augments Section 014000). BSD ASCLME Nov 11
REV 01 4533 Code-Required Special Inspections Special inspections required by International Building Code. BSD ASCLME* Nov 11
Current 01 5000 Temporary Facilities and Controls Requirements not considered the contractor's option; utilities; facilities; services. BSD ASCLME Mar 11
Current 01 5100 Temporary Utilities Electricity, lighting, heating, cooling, ventilation, and water; more detail than 01 5000. BSD ASCLME* Jan 09
Current 01 5213 Field Offices and Sheds Augments Section 01 5000 if more detail is necessary. BSD ASCLME Feb 11
Current 01 5500 Vehicular Access and Parking Augments Section 01 5000 if more detail is necessary. BSD ASCLME Feb 11
Current 01 5713 Temporary Erosion and Sediment Control Performance and prescriptive requirements; remedies for non-compliance. BSD ASCLME Aug 10
Current 01 5721 Indoor Air Quality Controls Procedures & testing under contractor's control; some LEED issues. BSD ASCLME Jul 11
Current 01 5813 Temporary Project Signage Project identification sign; other optional signs. BSD ASCLME Jan 09
REV 01 6000 Product Requirements Product options and substitutions; delivery, storage, protection. BSD ASCLME* Oct 11
Current 01 6116 Volatile Organic Compound (VOC) Content Restrictions VOC restrictions based on LEED and CHPS. BSD ASCLME May 11
Current 01 6116.01 Accessory Material VOC Content Certification Form For documenting that no high-VOC accessory materials have been used. BSD ASCLME Jan 09
Current 01 7000 Execution and Closeout Requirements Basic installation requirements; cutting/patching; cleaning; starting of systems; etc. BSD ASCLME* May 11
Current 01 7419 Construction Waste Management and Disposal Waste management plan; landfill diversion proposals; waste disposal reports. BSD ASCLME Aug 11
Current 01 7800 Closeout Submittals Project record documents; O & M manuals; warranties/bonds. BSD ASCLME May 11
Current 01 7900 Demonstration and Training Procedures for Owner-personnel demonstration, training; scope list. BSD ASCLME Feb 11
Current 01 9113 General Commissioning Requirements ++ Scope, objectives, procedures, Contractor's responsibilities. BSD ASCLME Aug 11
Current 01 9114 Commissioning Authority Responsibilities ++ Independent commissioning agent contracted directly to Owner. BSD ASCLME Aug 11